The new hospital building was created with the aim of giving priority to patient care. The building - 6 floors high for 27,000 square meters and about 200 beds - hosts 29 outpatient departments, operating rooms, 40 intensive care beds and about 155 beds for ordinary hospitalization.
In order to perfectly meet the requirements of silence and versatility of the waste system, the Triplus range was chosen.
To optimize the space allocated for the rainwater drainage system, thanks to our collaboration with Studio Uva, Rainplus was chosen, whose installation also protects the building in case of extreme weather conditions.