The rise of multi-level apartment and hotel construction in Australia has inspired renewed interest in prefabricated, modular plumbing assemblies. Let’s see all the advantages of choosing us and our MFV system.
Read the ArticleChatting with Andrew James, Director of Prestige Home WA
Andrew, were you satisfy with our MFV system and our service?
The prefabricated MFV system was fantastic to use. We saved time and of course money on the installation works for the plumber and framing up of the hob. Design process was streamline and the frames were so
easy to install and connect plumbing on site.
Would you use it again? If yes, why?
Of course, MFV system is the way forward especially when installation concealed toilet cisterns.
Kingston will be regenerated with a 63-room, 900 square metre hotel by Abode Group. The three-storey hotel will deliver the group's signature self-contained, apartment-style rooms, in a design that complements Kingston's streetscape. Set among an array of restaurants and cafes, the hotel will be a vibrant addition to old town Kingston.
The project Includes 230 high-end residential units, a 180-room hotel, 2,000sqm of ground and upper-level commercial space, and 180 public car parks.
This is the first stage of a Billion dollar development. Republic stage one comprises over 380 high-end apartments.
Another great installation by Planet Plumbing, going well and fast using Valsir Triplus acoustic drainage system at the Brisbane 1 towers. Built by Hutchinson Builders, the project will include in excess of 700 apartments.
Click for LinkedIn postIt is with pride, that the team at Valsir Australia watched the truck leave for Canberra with the 59 bathroom modules for the next Abode Hotel by Geocon.
Click for LinkedIn postIt is with pride, that the team at Valsir Australia watched the truck leave for Canberra with the 59 bathroom modules for the next Abode Hotel by Geocon.
Click for LinkedIn postO’Neil & Brown Plumbing completed the Valsir Triplus drainage installation of the Infinity Towers in Canberra, in just 4 months with 3 Plumbers. The infinity residential Towers built by GEOCON includes, 420 apartments spread over two towers of 21 levels each. How O’Neil & Brown have managed to achieve such installing speed?
Click for LinkedIn post